Technical Guidance on Schedule Planning and Cost Budgeting for the Construction of the Darus Salam Alwahid Mosque in Malang

Authors

  • sitti safiatus riskijah politeknik negeri malang

DOI:

https://doi.org/10.57203/abdiwangi.v3i2.2026.64-74

Keywords:

Planning, Schedule, Implementation Costs, Mosque Construction

Abstract

The construction of the Darussalam Mosque in Merjosari, Malang, requires a schedule plan and budget implementation plan (RAP) as a reference for implementation and to seek funding sources in order to run smoothly, effectively, and efficiently. The schedule plan and RAP can estimate how long the mosque construction will take and how much funding is needed. To that end, the mosque management requested Polinema's support in providing technical guidance in planning the schedule and budget for the construction of the mosque through the PKM team. The schedule was planned using the Barchart and S-curve methods with the help of MS Project. The RAP was prepared based on the 2024 Malang City HSPK and AHSP Permen PUPR No. 10 of 2023. The results of the schedule and budget planning show a planned completion duration of 168 calendar days with 6 working days per week and 8 working hours per day. The planned implementation budget is IDR 3,161,449,934.00 with a total building area of 653 m2, or IDR 4,845,134.00 per m2 excluding VAT.

Downloads

Download data is not yet available.

References

Anggara, M. Rizan Aji. 2025. Desain dan Struktur Bangunan Masjid Modern. Dinaka Struktur. https://strukturbangunan.com/struktur-bangunan-masjid/.

Arifuddin, Rosmariani. DKK. (2024). Manajemen Proyek. Yogyakarta: CV. Budi Utama.

Asnin S.R.Lestaluhu, Rudi Serang, Meyke Marantika. Perencanaan Anggaran Biaya Dan Penjadwalan Pembangunan Gedung Kelas Baru MTsN-01 Negeri Tulehu Kabupaten MalukuTengah. ULILALBAB: Jurnal Ilmiah Multidisiplin Vol.3, No.10, September 2024. https://ulilalbabinstitute.id/index.php/JIM/article/view/5275/ 4249.

Callahan, Michael T. (1992). Construction Project Schedulling. McGrawHill. USA

Husen, Abrar. 2009. Manajemen Proyek. Yogyakarta: Andi.

Husen, Abrar. 2011. Penjadwalan dan Pengendalian Proyek. Yogyakarta: Andi Offset.

LAZNAS Dewan Dakwah. Fungsi Masjid dan Alasan Rasulullah saw Membangun Masjid. Dipublikasikan: 27 September 2024. https://laznasdewandakwah.or.id/article-detail/Fungsi-Masjid-dan-Alasan-Rasulullah-Membangun-Masjid/1745.

Nugraha, Adham Sahril dan Sumarman, 2017. Analisis Manajemen Konstruksi Pembangunan Kantor Samsat Cabang Pelayanan Provinsi Di Wilayah Majalengka Kabupaten Majalengka. Jurnal Konstruksi. Vol.6 No.3 Januari 2017. https://www.scribd.com/document/613241490/3843-10480-1-PB.

Ralahallo, F. N., Jaya, F. H. & Tukimun, 2024. Manajemen Proyek. Yogyakarta: Sulur Pustaka.

Rurianti, Dwi Visti & Adinata, Surya. 2022. Perencanaan Dan Analisa Anggaran Biaya untuk Pembangunan Mesjid Di Rumah Tahfiz Al-Qur’an Al-Atqiyadesa Logas. Jurnal Planologi dan sipil. Vol.4 No. 1 (2022). Februari 2022. https://ejournal.uniks.ac.id/index.php/JPS/article/view/2518/1979.

Simanjuntak, Manlian. DKK. (2023). Manajemen Proyek Kontruksi. Batam: Yayasan Cendikia Mulia Mandiri.

Siswanto, Agus B., dan Salim, M. Afif. 2019. Manajemen Proyek. Semarang: CV Pilar Nusantara.

Suryanto. Agus, Anan Nugroho. (2020). Manajemen Proyek Teknologi Informasi. Yogyakarta: CV. Budi Utama.

Tugiono, dan Yohanes Ari Agung Suharsono. 2006. “Penjadwalan Waktu Proyek dengan Metode Jeringan Kerja.” Skripsi, Fakultas Tehnik, Universitas Diponegoro.

Downloads

Published

30-04-2026

How to Cite

[1]
sitti safiatus riskijah, “Technical Guidance on Schedule Planning and Cost Budgeting for the Construction of the Darus Salam Alwahid Mosque in Malang”, J. Pengabdian Pemberdayaan Banyuwangi, vol. 3, no. 2, pp. 64–74, Apr. 2026, doi: 10.57203/abdiwangi.v3i2.2026.64-74.