“PERBANDINGAN WAKTU PEKERJAAN BEKISTING KONVENSIONAL DENGAN BEKISTING SISTEM PADA PEKERJAAN KOLOM PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT GRESIK SEHATI”. 2024. Jurnal Riset Teknik Sipil Dan Sains 3 (1): 29-35. https://doi.org/10.57203/j-riteks.v3i1.2024.29-35.