[1]
2024. PERBANDINGAN WAKTU PEKERJAAN BEKISTING KONVENSIONAL DENGAN BEKISTING SISTEM PADA PEKERJAAN KOLOM PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT GRESIK SEHATI. Jurnal Riset Teknik Sipil dan Sains. 3, 1 (Aug. 2024), 29–35. DOI:https://doi.org/10.57203/j-riteks.v3i1.2024.29-35.